Home / Service areas / Fairfax, VA / PVC roofing
PVC roofing in Fairfax, VA: when the storms arrive and how the sheet is held down
Fairfax County storm reports have a clock in them. Of 396 thunderstorm wind rows in NOAA files for 2016 through 2026, 283 begin between noon and 6 p.m., and 32 of the 40 hail rows do too. That is the window in which a PVC sheet that is bonded, plated or only half finished has to hold. This page sorts the rows by hour and month, then reads what the Virginia code and a federal PVC specification say about adhesive, fasteners, plates and seams. To talk through a Fairfax PVC roof, book a phone consultation.
- 283 of 396 county wind rows begin between noon and 6 p.m.
- 30 of 40 hail rows begin between 3 and 6 p.m.
- The code table pairs PVC with ASTM D4434
The storm clock: Fairfax County by hour
NOAA logs every Storm Events report with a start time. The county rows, filed under the label FAIRFAX, total 792 for 2016 through 2026: 396 thunderstorm wind, 40 hail and the rest flood, tornado and funnel entries. The Fairfax hub page counts them by month. This page counts them by hour, a cut that bears on how a roof is staged and left at the end of a work day.
| Clock band | Wind rows | Share of wind rows | Hail rows |
|---|---|---|---|
| Midnight to 5:59 a.m. | 11 | 2.8% | 0 |
| 6:00 to 11:59 a.m. | 10 | 2.5% | 1 |
| Noon to 2:59 p.m. | 96 | 24.2% | 2 |
| 3:00 to 5:59 p.m. | 187 | 47.2% | 30 |
| 6:00 to 8:59 p.m. | 76 | 19.2% | 5 |
| 9:00 p.m. to 11:59 p.m. | 16 | 4.0% | 2 |
| All rows | 396 | 100% | 40 |
NOAA Storm Events yearly detail files, 2016 through the September 2026 release, county label FAIRFAX, counted by script on October 24, 2026. Reports, not inspections or claims. Every row carries the time zone label EST-5, and the NOAA format sheet says its 24-hour times are usually local standard time, so a summer reading can sit an hour off the wall clock.
The strong end follows the same pattern. 383 wind rows are at 50 knots or more, about 58 mph. 45 are at 60 knots or more, about 69 mph, and 39 of those 45 begin between noon and 6 p.m. The highest value is 78 knots, about 90 mph, logged in three rows. Only 16 of the 396 carry a measured gust; the other 380 are estimated gusts, a split the NOAA format sheet defines.
The county also prints design numbers: an ultimate wind speed of 115 mph for Risk Category II and residential work and a ground snow load of 25 psf. Those are inputs to a calculation, so this page does not set them against the gust reports above. The county adds that 25 psf holds only if the design team uses the 2021 code snow figures with ASCE 7-16, and it says the state is correcting that code. Ask the plans reviewer which figures govern your parcel.
Hail by month and stone size
Hail rows are fewer and tied to the warm season. April has 4, May 19, June 10, July 2 and August 5. None of the 40 begins from September through March in these files. The rows fall on 22 distinct dates, and 11 of them are from one afternoon, May 2, 2016.
April and May: 23 rows
16 rows at 1.00 inch, 1 at 1.25, 5 at 1.50 and 1 at 1.75. Six rows are 1.50 inches or more.
June to August: 17 rows
7 rows at 1.00 inch, 3 at 1.25, 3 at 1.50, 2 at 1.75, and one each at 0.75 and 0.88. Five rows are 1.50 inches or more.
The 11 rows at 1.50 inches or more all begin between 2:15 p.m. and 5:35 p.m. Wind rows add a second fact. In 379 of the 396 narratives the text mentions a tree, branch or limb. The narratives say what fell or moved, not what any roof was made of.
"The sheet shall contain reinforcing fibers or reinforcing fabrics."
ASTM D4434/D4434M-21, scope 1.1 (archived copy of the ASTM page)That is the sheet standard for PVC. Hail and wind are questions about the whole assembly: the same scope lists wind uplift resistance among factors beyond the standard.
The ASTM page read is an archived copy of the 2021 edition, so confirm the current edition at ASTM before relying on any clause.
Three ways a PVC sheet is held down
Unified Facilities Guide Specification 07 54 19, PVC Roofing, is a federal document. It is not a Fairfax rule, but it spells out each attachment method in public text.
Fully adhered
Bonding adhesive goes on the substrate and, where the text allows, the underside of the sheet, but never on the seam or lap areas. Each sheet is rolled into the adhesive slowly to avoid wrinkles and air pockets.
A designer note says not to adhere PVC to perlite, polystyrene or standard wood fiber insulation board. The substrate under the sheet is part of the decision.
Mechanically attached with plates
Fasteners and stress plates come from the membrane maker, must meet FM 4470 for the uplift specified, and plates are formed to prevent dishing or cupping. Anchoring bars or rails may be used for high wind.
The sheet laps 5.5 to 7 inches for fastener and plate attachment, and a seam of at least 3 inches must remain beyond the plate edge. A designer note warns that condensation under a fastened system can build ice in winter.
Perimeters and penetrations
The note says every method fastens the sheet to wood nailers at perimeters, angular and circular penetrations and other roof features, except drains larger than 18 inches across.
Where a fastened system is also bonded at the perimeter, the bonded zone must match the zone of extra perimeter fasteners. Attachment patterns for field, corners and perimeter are submitted separately.
Two more points from the same text. It says adhered and fastened PVC systems must use reinforced membrane, always, outside prefabricated detail flashings. For regular extreme wind with airborne debris it names a 0.096 inch sheet instead of the 0.08 inch minimum. The Fairfax rows do not say how often debris strikes a roof, so that note is a question to put to the designer, not a finding.
What the Virginia code asks for wind
These clauses come from the 2021 Virginia Construction Code and Residential Code, read in third-party UpCodes copies because the code publisher blocks scripts. Check the official text before relying on a clause.
- Section 1504.1
- Roof decks and coverings are designed for wind loads under Chapter 16 and the rest of Section 1504.
- Section 1504.4
- A covering that is mechanically attached or adhered to the deck must resist the component and cladding wind pressures. Allowable stress design is permitted for the covering.
- Section 1504.4.1
- Fully adhered or mechanically attached single-ply systems are tested to FM 4474, UL 580 or UL 1897. The text lists three methods and does not choose among them, and it treats adhered and attached the same.
- Table 1507.12.2
- PVC, or a PVC and KEE blend, is paired with ASTM D4434. KEE alone is paired with D6754. The residential code lists D4434, D6754 or D6878 for thermoplastic coverings.
- Sections 1504.5 and 1507.12.3
- Ballasted low-slope single-ply roofs follow ANSI/SPRI RP-4 and stone ballast follows ASTM D448 or D7655. The federal PVC text says no stone or gravel on any PVC roof, so the two sources differ and a quote that includes ballast should say which governs.
- Section 1504.7
- Low-slope coverings that flex in wind must not lose significant breaking strength, for reinforced membranes, after 2,000 hours of accelerated weathering tests.
- Residential R905.1 and R905.13.3
- Coverings go on per the manufacturer instructions and resist the component and cladding loads of the residential tables.
The sections read print no fastener spacing, plate size or uplift pressure for PVC. A federal note gives one number: a roof system label of FM 1-90 corresponds to a maximum calculated uplift of 45 psf, because the label builds in a safety factor of 2. The number comes from the engineer and the tested assembly, not from a Fairfax page.
A roof day set against the afternoon window
The federal specification also orders the work of a day, and its steps can be laid against the hours in the table above. It governs federal work, so a private job follows its own contract and the manufacturer instructions. Ask to see them.
- Laps and seamsOverlaps run at least 3 inches at sides for adhered sheets, 5.5 to 7 inches for fastened sheets and 4 inches at ends. Laps lie so water flows over them, not against them.
- On the day of the weldThe entire length of every hot-air-welded seam is probed on the day of installation. Defects are rewelded, fishmouths are cut out and covered with membrane welded on all sides, and the repairs are probe tested.
- Before the afternoon rows beginIf work stops before the whole roof is weatherproof, the membrane is sealed to the deck at the cutoff. Asphalt and coal-tar products are not used for that seal.
- At the edgesFlashing seams are sealed 3 inches beyond the fasteners that hold the sheet to the nailers, and the top of the flashing is fastened at no more than 12 inches on centers.
- Next morningThe cutoff is opened by pulling the membrane free or cutting it to expose the insulation, and the fill-in insulation sheets are removed.
Checks before a PVC order is signed
- Does the quote name the attachment method, adhered, plated or a combination, with the perimeter and corner pattern stated apart from the field?
- Does the scope name the wind test, FM 4474, UL 580 or UL 1897, for the assembly, and say who supplies the pressure calculation?
- Does the product data sheet cite ASTM D4434, or D6754 for a KEE sheet, and say the sheet is reinforced?
- If ballast is proposed, which source governs, given that the federal PVC text bars stone?
- What is the written cutoff plan if a storm builds at 3 p.m. on a day when the roof is open?
- Which office reviews the permit for the parcel, the City of Fairfax or Fairfax County, as the Fairfax hub page compares?
PVC is one of several low-slope membranes, and the general PVC page and the materials overview compare it with the others. Roofers of Arlington installs, repairs and replaces roofs, including flat roof systems. See also commercial roofing, roof replacement and services. To talk through a Fairfax PVC roof, book a phone consultation.
Files and documents behind these counts
- NOAA Storm Events Database, yearly detail files 2016 to 2026, county label FAIRFAX, counted October 24, 2026
- NOAA Storm Data bulk csv format sheet, opened October 24, 2026
- UFGS 07 54 19, PVC Roofing, August 2023 edition, opened October 24, 2026
- ASTM D4434/D4434M-21 page (archived copy, 2025 snapshot), opened October 24, 2026
- 2021 Virginia Construction Code, Chapter 15 and Residential Code, Chapter 9, third-party UpCodes copies, October 24, 2026
- Fairfax County Codes and Standards, local design load criteria, opened October 24, 2026
Questions people ask
When in the day do Fairfax County thunderstorm wind reports begin?
In the NOAA rows for 2016 through 2026, 283 of 396 begin between noon and 5:59 p.m., 187 of them from 3:00 to 5:59 p.m. Only 21 begin before noon. The files label the clock EST-5, so treat the bands as approximate.
Does the Virginia code say how a PVC roof must be attached?
It says non-ballasted coverings, adhered or mechanically attached, must be designed for component and cladding wind pressures, and that adhered or attached single-ply systems are tested to FM 4474, UL 580 or UL 1897. The sections read print no fastener spacing. Read in a third-party copy; confirm the edition.
Is a PVC roof held down by adhesive or by plates?
Both exist. The code text treats fully adhered and mechanically attached single-ply the same way, and no Fairfax page read picks one. A federal specification describes each. Ask which one a quote means and how the perimeter is handled.
Does ASTM D4434 say how much wind a PVC roof can take?
No. The standard covers the sheet, which must contain reinforcing fibers or fabrics. Its scope lists wind uplift resistance among system factors beyond it. Wind performance comes from the tested assembly and the engineer calculation.
Is 115 mph the wind speed a Fairfax PVC roof has to survive?
The county prints 115 mph as an ultimate design speed for Risk Category II and residential work. That is an input to a pressure calculation, not a forecast and not the same kind of number as a reported gust. Ask the plans reviewer or the engineer which pressures apply.
How large was the biggest hail logged in Fairfax County?
NOAA logs 1.75 inches in three rows, and 11 of the 40 rows are 1.50 inches or more. None of the 40 begins between September and March in the 2016 to 2026 files. Reports are not inspections of any roof.
Can stone ballast go on a Fairfax PVC roof?
The Virginia code table includes ballasted low-slope single-ply roofs in general. The federal PVC specification says not to use stone or gravel ballast on any PVC membrane roof. The sources read give no Fairfax rule on PVC, so ask who decides.
What should happen to a PVC roof left unfinished at the end of the day?
The federal specification says to seal the membrane to the roof deck at the cutoff and not to use asphalt or coal-tar products for that seal. Ask what the written scope says for a cutoff before an afternoon storm.
Talk through your roof with Roofers of Arlington
Share the address, what you are seeing on the roof and the decision you need to make. We will tell you what to expect before anything is scheduled.