Home / Service areas / Alexandria, VA / Metal roofing
Metal roofing in Alexandria, VA: the code text, section by section
Alexandria's permit pages never use the word metal. The rules that touch a metal roof here sit in Virginia's building code, in one state exemption, and in the Board of Architectural Review's sheets for historic addresses. This page reads those texts in order: how the code sorts the roof, what it says about the deck, the panel and the fasteners, what it says about putting metal over an old roof, and where the City's pages stop. Roofers of Arlington installs, repairs and replaces roofs, including metal systems.
- 2 or more existing layers: the code bars a recover
- 3 or more dwelling units: Alexandria treats the building as commercial
- 0 mentions of metal on the City's permit pages
Which code book applies to your building
Virginia sets one building code for the whole state, and Alexandria enforces it through its Code Administration office. The City adds the sorting step: its Permit Requirements page puts detached houses, two-family homes and townhouses of up to three stories in a residential category, and lists buildings of three or more dwelling units, apartments and condominiums, as commercial. A roof on one of the first kind answers to the residential code. A roof on one of the second kind answers to the commercial code, which words the same metal rules a little differently.
Residential path
The Virginia Residential Code, chapter 9, section R905.10 covers metal roof panels. The state's exemption list (13VAC5-63-80) leaves out of permitting an unlimited amount of roof covering replacement in the R-3, R-4 and R-5 groups, provided the design wind speed is not above 100 mph. See the roof replacement page for the general process.
Commercial path
The Virginia commercial code, chapter 15, section 1507.4 covers the same panels, and section 1504.4 adds wind testing. The exemption list also frees 100 square feet or less of roof covering in every group, so a larger commercial reroof starts from the other side of the line. See also commercial roofing.
Not sure which side you are on? The Alexandria roofing guide covers the housing mix. For a condominium, the board's approval comes first.
What the code says about the panel itself
The residential section for metal panels is short, and the commercial section repeats it with small differences. Slopes are on the general metal roof page; this page reads the other parts.
- Deck
- Panels go on solid or spaced sheathing, except where the covering is designed to go on spaced supports. The commercial text says "solid or closely fitted deck" for the same case.
- Metal and thickness
- Table R905.10.3(1) names a standard for each metal. Aluminum follows ASTM B209 at a minimum thickness of 0.024 inch for roll-formed panels and 0.019 inch for press-formed shingles. Cold-rolled copper follows ASTM B370 at 16 ounces per square foot. Zinc has a minimum thickness of 0.027 inch. Galvanized steel is listed at ASTM A653, G90.
- Coating
- Table R905.10.3(2) sets minimum corrosion resistance by coating: aluminum-zinc alloy steel at ASTM A792 AZ 50, aluminum-coated steel at ASTM A463 T2 65, and galvanized steel at G-90. Paint on steel is read under ASTM A755 and goes over one of those coatings.
- Underlayment
- Section R905.10.5 sends metal panels to R905.1.1. That section lists metal roof panels among the coverings whose underlayment must meet the chapter's standards, with an alternative: a 4-inch self-adhering strip over every deck joint.
None of these tables says how loud rain is on the panel or which finish suits Alexandria. Put those in the written scope.
Seams, clips and fasteners
The building code never describes a seam. It sorts by slope and by test. The seam vocabulary comes from the Metal Construction Association (MCA), which describes standing-seam systems as vertical panels fastened with hidden clips or fastening flanges, and corrugated or tile-look panels as fastened through the face with exposed fasteners. On low-slope jobs the MCA says some panels need machine seaming: a seaming tool is rolled along the panels to crimp them together.
Attachment is where the code hands over to the manufacturer. Panels are secured as the chapter and the manufacturer's instructions say. The code names fasteners only for the gap case where no instructions exist: galvanized for steel, copper, brass, bronze, copper alloy or 300-series stainless for copper, and stainless as acceptable on any metal roof.
The National Park Service adds two cautions from the historic side. Steel nails in copper sheets are its example of galvanic corrosion, where dissimilar metals touching start to corrode. And it says sheet metals may fail if nailed too rigidly, because thermal movement fatigues the metal at joints.
Attachment
Is the panel held by hidden clips, a fastening flange or exposed fasteners?
Metal
Which metal is each clip and fastener made of?
Movement
Where does the quote say the panel is free to move?
For wind, the commercial code does name tests. Metal panel systems on a solid or closely fitted deck are tested to FM 4474, UL 580 or UL 1897. A structural panel that serves as both deck and covering is tested to ASTM E1592 or FM 4474 when it is standing seam, and to ASTM E1592, FM 4474 or UL 580 when through-fastened. Ask which listing the quoted product carries.
Metal over an old roof: replacement versus recover
The City's pages do not answer this question. The residential code does, by drawing a line between two words.
- Replacement. The code says it "shall include the removal of existing layers of roof coverings down to the roof deck." That is the default.
- Recover. A new covering over an old one is permitted when it follows the covering manufacturer's approved instructions. The text singles out complete, separate systems, with standing-seam metal as its example, that carry the roof loads directly to the structure and do not rely on the old roof for support. Those need not remove the existing covering.
- No recover. It is not permitted where the old roof is water soaked or deteriorated to the point it cannot serve as a base, where the old covering is slate, clay, cement or asbestos-cement tile, or where the roof already has two or more applications of any covering.
- Wood shingle or shake underneath. Metal panels and shingles may go over it, but where that creates a combustible concealed space the whole surface must first be covered with gypsum board, mineral fiber, glass fiber or another approved material.
Two cautions. The recover language says nothing about the deck, flashings or edges under a new covering, so the scope has to. And flat roofs follow a different route. The MCA describes retrofit systems in which light-gauge steel sub-framing is installed over the existing roof's structural supports and the new framing is engineered to keep the roof system's structural integrity. A roof like that needs an engineer's drawings, not just a panel order. The flat roof page covers membrane alternatives.
What Alexandria's own pages say
Three City documents bear on a metal roof.
| Document | What it says |
|---|---|
| Permit Requirements and Permit Center pages | Permits are needed for most construction and maintenance work, applied for through APEX. A text search of both saved pages finds neither roof nor metal. Code Administration's printed number is 703.746.4200. |
| State exemption, 13VAC5-63-80 | Exempts roof covering replacement in R-3, R-4 and R-5 unless the nominal design wind speed is above 100 mph, and 100 square feet or less in any group. The building official may require an application for roofing in a locally designated historic district. |
| Policy PP 2012-01 (April 12, 2012, under the 2009 code) | Says replacement roofing in a locally designated historic district needs a permit, including Parker-Gray and Old Town, and that the Board of Architectural Review may need to approve work even without a building permit. Dated; the current permit page does not repeat it. |
For a historic address the Board's sheets then name metal. Its policy says original metal roofing is replaced in the same style: standing seam, flat seam or stamped shingle. A pre-formed, pre-finished standing-seam panel may stand in for a field-installed one only where the seams and the metal pan are the same sizes, and solid copper may replace painted standing seam. The roofing chapter lists standing-seam metal and stamped metal shingle among the materials found across the districts. The district map and thresholds are in the Alexandria guide.
The City's permit pages do not say whether re-covering with metal is a replacement or a recover, how a plan reviewer reads a standing-seam retrofit, or what a commercial reroof must submit beyond the checklists listed on the page. Ask Code Administration.
Questions that put the code text into a scope
- Is my building residential or commercial under the City's sorting, and which code chapter does the quote cite?
- Does the scope treat the job as a replacement down to the deck or a recover, and which sentence of the code supports that?
- If a recover: how many layers are on the roof now, and is the old roof sound?
- What is the deck, and is the panel designed for solid sheathing, spaced supports or open framing?
- Which panel metal, coating standard and thickness are quoted, matched against the code tables?
- Which clips and fasteners are named, in which metals, and how do they let the panel move?
- Which wind test listing does the panel carry, and is it the commercial-code list?
- If the address is historic or an association building: has the permit, the Board or the association answered, and in writing?
A phone consultation starts from the address, the building type and what is visible from the ground. The wider materials page and the services page show the other systems. Call (571) 397-6072.
Where each claim comes from
Opened October 19, 2026. The Virginia code text was read through the UpCodes copy of the Virginia editions because the code publisher's site blocks automated access, so confirm any section with Alexandria Code Administration before relying on it.
- Virginia Residential Code 2021, chapter 9 Roof Assemblies (R905.1, R905.10, R908)
- Virginia commercial code 2021, chapter 15 Roof Assemblies (1504.4, 1507.4)
- 13VAC5-63-80, Virginia Administrative Code
- MCA steep slope metal roofing, low slope metal roofing and retrofit systems
- National Park Service, Preservation Brief 4: Roofing for Historic Buildings
- City of Alexandria: Permit Requirements (updated April 3, 2026) and Permit Center
- Code Administration policy PP 2012-01 (April 12, 2012)
- BAR Policies for Administrative Approval (amended September 24, 2025) and Roofing chapter, Old and Historic District (amended July 16, 2025)
Questions people ask
Does Alexandria say anything specific about metal roofs on its permit page?
No. The City's Permit Requirements page, updated April 3, 2026, sorts buildings into residential and commercial and says permits are required for most construction and maintenance work, but the page text names neither roofs nor metal. For a metal roof the answer comes from the state code and from Code Administration, 703-746-4200.
Can a standing-seam roof go over my old roof in Alexandria?
The 2021 Virginia Residential Code says complete, separate systems such as standing-seam metal that carry their own loads to the structure do not require removal of the existing covering. It also bars a recover where the old roof is water soaked or deteriorated, or has two or more layers.
Why would two metal quotes name different fasteners?
The code lets the manufacturer's instructions decide, and names fasteners only for the case where there are none: galvanized for steel, copper-family or 300-series stainless for copper. The National Park Service warns that dissimilar metals in contact corrode.
What tests do metal panel roofs have to pass under the commercial code?
The 2021 Virginia commercial code says metal panel systems on a solid or closely fitted deck are tested to FM 4474, UL 580 or UL 1897. A structural panel that is also the deck is tested to ASTM E1592 or FM 4474, and a through-fastened one can use UL 580.
Is a flat-seam roof the same thing as standing seam?
In the City's historic sheets they are separate styles. The Board's policy names standing seam, flat seam and stamped shingle as the three metal styles that an original metal roof must be replaced in kind. The building code does not use those labels. It sorts by slope, with a lower limit for standing-seam systems than for lapped panels.
Does a metal roof on an Alexandria condominium follow the home code?
Not necessarily. The City counts a building of three or more dwelling units, apartments or condominiums, as commercial. Commercial roofs use the Virginia commercial code, whose metal panel section has its own wording on decks and attachment. The association approves the work as well, so start with the board.
Does the state exemption cover a new metal roof in Old Town?
The state text exempts roof covering replacement in R-3, R-4 and R-5 buildings unless the nominal design wind speed is above 100 mph. It also lets the building official require an application for roofing in a locally designated historic district. A 2012 City memo says that includes Parker-Gray and Old Town.
Talk through your roof with Roofers of Arlington
Share the address, what you are seeing on the roof and the decision you need to make. We will tell you what to expect before anything is scheduled.