A rubber membrane on a McLean roof is looked after by whoever holds the building, and the Census can say a little about who that is. This page reads the tenure and year-built table for 17,147 occupied McLean homes, with its margins of error, then turns to the neutral guidance on what an EPDM inspection checks, how cured rubber is patched, and where Virginia's code draws the line between a repair and a re-roof.

  • 14,757 owner-occupied and 2,390 renter-occupied McLean homes
  • Margins of error shown for every build-year band
  • Repair, recover and replacement are three different jobs in the code

Tenure and year built, with margins

What this table can and cannot say

Census table B25036 cross-counts occupied homes by who lives there (owner or renter) and when the structure was built. It does not record roof coverings, and it counts homes, not buildings. Read it as a map of who is probably making maintenance calls, not as a count of rubber roofs.

Structure builtOwner-occupied homesRenter-occupied homes
1949 or earlier468 (plus or minus 150)58 (plus or minus 65)
1950 to 19695,225 (plus or minus 526)888 (plus or minus 224)
1970 to 19894,679 (plus or minus 403)738 (plus or minus 204)
1990 to 20092,446 (plus or minus 296)315 (plus or minus 135)
2010 or later1,939 (plus or minus 278)391 (plus or minus 136)
All occupied14,757 (plus or minus 506)2,390 (plus or minus 280)

Source: Census Bureau, American Community Survey 2024 five-year estimates (2020 to 2024), McLean CDP, table B25036. Original ten year bands were combined here; margins for the combined bands were computed by the root-sum-of-squares method the Census describes. Margins are at the 90 percent level.

Reading the owner column

The largest band is 1950 to 1969, with 5,225 owner-occupied homes. The margin is 526, so the true figure could sit anywhere from about 4,700 to 5,750. That band and the 1970 to 1989 band together hold 9,904 of the 14,757 owner homes. The table cannot see any roof decision made since those structures were built.

Reading the renter column

The newest band has 391 renter homes against 315 in the 1990 to 2009 band, but the margins of 136 and 135 overlap, so the table shows no real difference between them. The renter row for 1949 or earlier reads 58 with a margin of 65: the margin is larger than the estimate, which means the data cannot rule out zero.

Which person holds the roof, by building type

Owner-occupied house
The owner decides, after reading the county permit list and any recorded association guidelines.
Rented house
The landlord holds the roof. A tenant who sees a stain should photograph it and report it in writing under the lease, since the Census table says nothing about lease terms.
Townhouse in an association
The recorded declaration says whether the roof is an owner item or a common component. Virginia law requires the board to study reserves for capital components at least every five years and review the study each year.
Condominium or co-op building
The board and manager commission inspections. Ask whether the roof is a common component, who keeps the inspection record, and when it was last updated.
Commercial or mixed-use building
The owner or property manager decides, and the county permit list for commercial work applies. The 100 square foot line on that list is covered below.

For the street-level picture, the McLean roofing guide sets out the county permit list, the historic overlay and the association layer. This page stays with the membrane itself.

What an EPDM inspection looks at

No single public document is a complete inspection standard for a McLean rubber roof. Three neutral sources agree on the order of a walk-through: an industry trade article reposted by the EPDM Roofing Association, a second trade article on maintenance planning, and a federal guide specification for EPDM roofing.

  1. Drainage first. The trade article quotes an SPRI member advising that the fall visit start with a check of drains, scuppers, gutters and overflows for debris. The federal specification, written for new roofs, goes further and tests each drain: run a hose into it for five minutes, clear a slow drain, and repeat until it flows freely.
  2. Ponding. The same article describes a discoloration ring as an obvious sign of repeated ponding. Water standing away from the drains is the question to put to the inspector.
  3. Soft spots. Walking the roof can reveal soft areas. The ARMA technical director is quoted advising that each location be noted and compared with the interior for signs of water entry.
  4. Perimeter and flashings. The checklist names loose coping or fascia, missing splice plates, opened seams, empty fastener holes and loose gutter straps. A second article singles out flashings at penetrations, parapets, curbs and equipment bases as places that need deliberate examination.
  5. Sealant and surface. Exposed sealant at termination bars and flashings should be checked for UV deterioration. If the reinforcement fibers show through the membrane, the ARMA director says the roof is "likely approaching the end of its useful life cycle," and a recover or replacement is the likelier path than a repair.
  6. Moisture below. The federal specification, again for new work, calls for infrared moisture testing under ASTM C1153 across the whole roof area to confirm that insulation is dry. A surface walk cannot show that.

Both trade articles recommend looking twice a year, and the later one adds a walk after severe weather. Ask whether the last two inspections exist on paper.

The federal specification also gives a hint about wear. Where the roof carries foot traffic for maintenance once a month or more, its designer note says to use rubber walkboards or pavers, and it asks workers to wear clean, soft-soled shoes and to keep sharp-edged equipment off the membrane. Whether a roof with regular rooftop service has walkpads is a fair question for an inspector.

Patching cured rubber

What the sources say

The EPDM Roofing Association describes a repair as washing the membrane, preparing the surface and applying the repair material, which can include coatings. Its technical bulletin adds that EPDM can be repaired without power or specialized tools, which matters in buildings where hot work or fuel-burning tools are not allowed. It also says the membrane and repair materials work on vertical faces such as parapets.

What the federal specification says

The guide specification for new EPDM roofs requires flashing of at least 0.060 inch in cured EPDM, with uncured sheet limited to inside and outside corners, scuppers, pourable sealer pockets and other shapes where cured material is impractical. Laps are at least three inches, seam tape at least three inches wide, and heat guns and open flame are barred for speeding up adhesive or primer drying.

The specification governs a new installation, not a patch on an aged roof, so it is a reference point, not a repair standard. Neither source gives a procedure for a particular patch size. The ARMA director quoted in the trade article advises conferring with the manufacturer and preparing the surface as its instructions require.

  • Which area is being patched, in square feet, and where it sits on a sketch.
  • Whether the repair material is cured or uncured, and why that choice fits the location.
  • What cleaning and surface preparation the manufacturer calls for before the patch.
  • Whether the repair sits on dry insulation, and how that was confirmed.

When a repair is a repair

The Virginia existing-building code gives each level of work its own definition. The text below was read on a third-party copy of the 2021 code, so confirm the wording with the county.

  1. Routine maintenanceCleaning drains and checking sealant. The repairs chapter says routine maintenance and the abatement of wear from normal service are outside its repair requirements.
  2. RepairDefined as reconstruction, replacement or renewal of any part of an existing building to maintain it or correct damage. The chapter lists patching and restoration of damaged materials. Undamaged parts that must be touched for the repair count as part of the repair.
  3. Roof coatingThe definitions cover a fluid-applied adhered coating used for roof maintenance, roof repair or as part of a covering system. ERA describes coatings as one way to restore an aged membrane, so ask which of those a proposal means.
  4. RecoverA new covering installed over the existing one without removing it. The code sets its own conditions for when this is allowed, and the county can say how it applies.
  5. ReplacementRemoval of the existing covering, repair of any damaged substrate and a new covering.

The same chapter says repair work "shall not make the building less conforming" than it was before.

Virginia Existing Building Code 2021, section 501.2, third-party copy

Permits follow the wording too. The state building code lists replacement of 100 square feet or less of roof covering, in any building group, among the ordinary repairs that need no permit, and it exempts unlimited replacement in house-type groups where the nominal wind speed is not over 100 miles per hour. Fairfax County lists roof repairs among the work that does need a permit, under both residential and commercial headings, while its no-permit lists mention shingle replacement and, for commercial work, under 100 square feet of covering. A trade article also notes that some codes bring the entire roof into compliance once a repair passes a share of the roof area, such as 25 percent. Ask the county whether that applies in McLean.

Records worth asking for

2inspections a year in the trade guidance, spring and fall
5 minhose test per drain in the federal specification
3 inminimum lap and seam tape width in the same specification

The federal specification asks the installer to leave a roof information card listing the system. The list is a good model for a McLean owner or association to request from whoever last worked on the roof.

  • Deck type, membrane, number of plies and how the membrane is attached.
  • Insulation, cover board, tapered insulation for drainage, and whether a vapor retarder is present.
  • Date of completion, installer contact and manufacturer contact.
  • Time-stamped photographs from each inspection, filed with the building record, as the trade article advises.
  • A signed report from each inspection, including any repair, with materials named.

Book a phone consultation to talk through a McLean EPDM roof. For the membrane itself, the general EPDM roofing page and the materials overview carry the basics. The flat roof, roof repair, roof replacement, commercial roofing and services pages cover scope, and the McLean guide covers the local paperwork.

Documents and dates opened

Every page below was opened on October 20, 2026. Copies on third-party sites are labeled. The EPDM Roofing Association is a trade group, so its statements are reported as its own.

Questions people ask

Does the Census say how many McLean roofs are EPDM?

No. The table used here counts occupied homes by tenure and by the decade the structure was built. It says nothing about roof coverings, so it cannot show which McLean buildings carry a rubber membrane. It only shows who lives in the homes and how old the structures are.

What does an EPDM roof inspection actually check?

Trade guidance quoted by ERA starts with the drains, scuppers, gutters and overflows, then looks for ponding, walks the roof for soft spots, and checks perimeter flashings, splice plates, seams, fastener holes and exposed sealant. Ask an inspector to match each item to a photograph.

Can a cured EPDM membrane be patched, or does the whole sheet have to go?

The EPDM Roofing Association describes repairs as washing the membrane, preparing the surface and applying the repair material. A federal guide specification also names cured EPDM for flashings and limits uncured sheet to corners and awkward shapes. Whether a given patch is sound depends on the membrane condition and the manufacturer's instructions.

Does Fairfax County require a permit to repair a flat roof?

The county's list of work that needs a permit names roof repairs under both its residential and commercial headings. Its no-permit lists mention replacing roof shingles and, for commercial work, replacing under 100 square feet of roof covering. Because the wording of the job matters, ask Land Development Services at 703-222-0801 before work starts.

When does a repair turn into a recover or a replacement?

Virginia's existing-building text defines a repair as reconstruction, replacement or renewal of part of a building to maintain it or correct damage. A recover adds a covering over the old one, and a replacement removes it. One trade source adds that some codes pull in the whole roof when a repair passes a share of the area, so ask the county how it counts.

Who pays for roof maintenance in a McLean condominium or townhouse community?

That follows your recorded documents. For townhouse communities under Virginia's Property Owners' Association Act, the board must study reserves for capital components at least every five years and review the result yearly. Ask your manager whether the roof is a common component and when the last study was done.

What should I ask for after an EPDM repair?

Ask for a written description of the area repaired, the materials used, photographs before and after, and the location marked on a roof sketch, filed with the building record.

What can I cover on a phone consultation with Roofers of Arlington?

Book a phone consultation and have the street address, the building type, whether an association is involved, and what you can see from the ground ready. The talk is about which documents apply to a McLean low-slope roof, not about prices or timing.

Talk through your roof with Roofers of Arlington

Share the address, what you are seeing on the roof and the decision you need to make. We will tell you what to expect before anything is scheduled.

Book a phone consultation (571) 397-6072
Call (571) 397-6072Book a Call